{"id":19353,"date":"2023-07-06T04:08:53","date_gmt":"2023-07-06T04:08:53","guid":{"rendered":"https:\/\/seecon.de\/?post_type=product&#038;p=19353"},"modified":"2025-10-06T13:56:49","modified_gmt":"2025-10-06T13:56:49","slug":"entwicklung-kunstlederfabrik-borsdorf-projektsteuerung","status":"publish","type":"product","link":"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/","title":{"rendered":"Development oilcloth factory Borsdorf - project management"},"content":{"rendered":"<p>The site of the former \"Zweenfurth artificial leather and oilcloth factory Alexander Schuhmann\" and the adjacent green spaces are to be put to a new use. The desolation of the approx. 12 hectare site that accompanied the end of production has caused the development of a wasteland. In order to stop this progressive development, there is an urgent need for urban planning for the area.<\/p>\n<p>In the course of the preparation of the development plan by seecon Ingenieure, the development of a high-quality place to live and stay is to be ensured. The intended conversion of the area into a residential quarter provides for the construction of a single-family home area in combination with multi-storey residential buildings, assisted living and a day care centre in the new building, as well as the renovation of the listed existing buildings, also in the sense of residential use. In addition to upgrading the existing buildings, the existing green areas are to be secured and upgraded, and the traffic and media development is to be planned.<\/p>\n<p>In order to coordinate the engineering planning and participants involved both internally and externally, project management is required. In this context, seecon Ingenieure was commissioned with the coordination of the planning participants, organisation of the participation of the authorities, monitoring and updating of the time schedule, organisation and monitoring of deadlines as well as the plausibility check of specialised planning within the scope of two years. This was done at all times in close communication with the private and public clients.<\/p>","protected":false},"excerpt":{"rendered":"<table width=\"656\">\n<tbody>\n<tr>\n<td width=\"212\"><strong>Category<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"212\">Development plan, project management<\/td>\n<\/tr>\n<tr>\n<td width=\"212\"><strong>Customer:<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"212\">Community of Borsdorf<\/p>\n<p>SRM Holding GmbH<\/td>\n<\/tr>\n<tr>\n<td width=\"212\"><strong>Period<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"212\">2020 - 2024<\/td>\n<\/tr>\n<tr>\n<td width=\"212\"><strong>Performance components<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"212\">Development plan, traffic facilities, species protection, green space plan, media-technical development, energy concept, project management<\/td>\n<\/tr>\n<\/tbody>\n<\/table>","protected":false},"featured_media":22485,"template":"","meta":{"_acf_changed":false},"product_brand":[],"product_cat":[38],"product_tag":[],"class_list":["post-19353","product","type-product","status-publish","has-post-thumbnail","product_cat-stadt","first","instock","shipping-taxable","product-type-simple"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5 - aioseo.com -->\n\t<meta name=\"description\" content=\"Kategorie Bebauungsplan, Projektsteuerung Kunde: Gemeinde Borsdorf SRM Holding GmbH Zeitraum 2020 \u2013 2024 Leistungsbestandteile Bebauungsplan, Verkehrsanlagen, Artenschutz, Gr\u00fcnordnungsplan, Medientechnische Erschlie\u00dfung, Energiekonzept, Projektsteuerung\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_GB\" \/>\n\t\t<meta property=\"og:site_name\" content=\"seecon Ingenieure GmbH - Engineering for a Better Tomorrow\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Entwicklung Wachstuchfabrik Borsdorf \u2013 Projektsteuerung - seecon Ingenieure GmbH\" \/>\n\t\t<meta property=\"og:description\" content=\"Kategorie Bebauungsplan, Projektsteuerung Kunde: Gemeinde Borsdorf SRM Holding GmbH Zeitraum 2020 \u2013 2024 Leistungsbestandteile Bebauungsplan, Verkehrsanlagen, Artenschutz, Gr\u00fcnordnungsplan, Medientechnische Erschlie\u00dfung, Energiekonzept, Projektsteuerung\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-07-06T04:08:53+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-10-06T13:56:49+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Entwicklung Wachstuchfabrik Borsdorf \u2013 Projektsteuerung - seecon Ingenieure GmbH\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Kategorie Bebauungsplan, Projektsteuerung Kunde: Gemeinde Borsdorf SRM Holding GmbH Zeitraum 2020 \u2013 2024 Leistungsbestandteile Bebauungsplan, Verkehrsanlagen, Artenschutz, Gr\u00fcnordnungsplan, Medientechnische Erschlie\u00dfung, Energiekonzept, Projektsteuerung\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/product\\\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/alle-projekte\\\/#listItem\",\"name\":\"ALLE PROJEKTE\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/alle-projekte\\\/#listItem\",\"position\":2,\"name\":\"ALLE PROJEKTE\",\"item\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/alle-projekte\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/product-category\\\/stadt\\\/#listItem\",\"name\":\"Stadt\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/product-category\\\/stadt\\\/#listItem\",\"position\":3,\"name\":\"Stadt\",\"item\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/product-category\\\/stadt\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/product\\\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\\\/#listItem\",\"name\":\"Entwicklung Wachstuchfabrik Borsdorf \\u2013 Projektsteuerung\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/alle-projekte\\\/#listItem\",\"name\":\"ALLE PROJEKTE\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/product\\\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\\\/#listItem\",\"position\":4,\"name\":\"Entwicklung Wachstuchfabrik Borsdorf \\u2013 Projektsteuerung\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/product-category\\\/stadt\\\/#listItem\",\"name\":\"Stadt\"}}]},{\"@type\":\"ItemPage\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/product\\\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\\\/#itempage\",\"url\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/product\\\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\\\/\",\"name\":\"Entwicklung Wachstuchfabrik Borsdorf \\u2013 Projektsteuerung - seecon Ingenieure GmbH\",\"description\":\"Kategorie Bebauungsplan, Projektsteuerung Kunde: Gemeinde Borsdorf SRM Holding GmbH Zeitraum 2020 \\u2013 2024 Leistungsbestandteile Bebauungsplan, Verkehrsanlagen, Artenschutz, Gr\\u00fcnordnungsplan, Medientechnische Erschlie\\u00dfung, Energiekonzept, Projektsteuerung\",\"inLanguage\":\"en-GB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/product\\\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\\\/#breadcrumblist\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/seecon.siera.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/neutral-1.png\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/product\\\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\\\/#mainImage\",\"width\":733,\"height\":477},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/product\\\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\\\/#mainImage\"},\"datePublished\":\"2023-07-06T04:08:53+00:00\",\"dateModified\":\"2025-10-06T13:56:49+00:00\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/#organization\",\"name\":\"seecon Ingenieure GmbH\",\"description\":\"Engineering for a Better Tomorrow\",\"url\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/\",\"name\":\"seecon Ingenieure GmbH\",\"description\":\"Engineering for a Better Tomorrow\",\"inLanguage\":\"en-GB\",\"publisher\":{\"@id\":\"https:\\\/\\\/seecon.siera.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Entwicklung Wachstuchfabrik Borsdorf \u2013 Projektsteuerung - seecon Ingenieure GmbH","description":"Kategorie Bebauungsplan, Projektsteuerung Kunde: Gemeinde Borsdorf SRM Holding GmbH Zeitraum 2020 \u2013 2024 Leistungsbestandteile Bebauungsplan, Verkehrsanlagen, Artenschutz, Gr\u00fcnordnungsplan, Medientechnische Erschlie\u00dfung, Energiekonzept, Projektsteuerung","canonical_url":"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/seecon.siera.com\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/seecon.siera.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/seecon.siera.com\/en\/alle-projekte\/#listItem","name":"ALLE PROJEKTE"}},{"@type":"ListItem","@id":"https:\/\/seecon.siera.com\/en\/alle-projekte\/#listItem","position":2,"name":"ALLE PROJEKTE","item":"https:\/\/seecon.siera.com\/en\/alle-projekte\/","nextItem":{"@type":"ListItem","@id":"https:\/\/seecon.siera.com\/en\/product-category\/stadt\/#listItem","name":"Stadt"},"previousItem":{"@type":"ListItem","@id":"https:\/\/seecon.siera.com\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/seecon.siera.com\/en\/product-category\/stadt\/#listItem","position":3,"name":"Stadt","item":"https:\/\/seecon.siera.com\/en\/product-category\/stadt\/","nextItem":{"@type":"ListItem","@id":"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/#listItem","name":"Entwicklung Wachstuchfabrik Borsdorf \u2013 Projektsteuerung"},"previousItem":{"@type":"ListItem","@id":"https:\/\/seecon.siera.com\/en\/alle-projekte\/#listItem","name":"ALLE PROJEKTE"}},{"@type":"ListItem","@id":"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/#listItem","position":4,"name":"Entwicklung Wachstuchfabrik Borsdorf \u2013 Projektsteuerung","previousItem":{"@type":"ListItem","@id":"https:\/\/seecon.siera.com\/en\/product-category\/stadt\/#listItem","name":"Stadt"}}]},{"@type":"ItemPage","@id":"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/#itempage","url":"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/","name":"Entwicklung Wachstuchfabrik Borsdorf \u2013 Projektsteuerung - seecon Ingenieure GmbH","description":"Kategorie Bebauungsplan, Projektsteuerung Kunde: Gemeinde Borsdorf SRM Holding GmbH Zeitraum 2020 \u2013 2024 Leistungsbestandteile Bebauungsplan, Verkehrsanlagen, Artenschutz, Gr\u00fcnordnungsplan, Medientechnische Erschlie\u00dfung, Energiekonzept, Projektsteuerung","inLanguage":"en-GB","isPartOf":{"@id":"https:\/\/seecon.siera.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/#breadcrumblist"},"image":{"@type":"ImageObject","url":"https:\/\/seecon.siera.com\/wp-content\/uploads\/2023\/07\/neutral-1.png","@id":"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/#mainImage","width":733,"height":477},"primaryImageOfPage":{"@id":"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/#mainImage"},"datePublished":"2023-07-06T04:08:53+00:00","dateModified":"2025-10-06T13:56:49+00:00"},{"@type":"Organization","@id":"https:\/\/seecon.siera.com\/en\/#organization","name":"seecon Ingenieure GmbH","description":"Engineering for a Better Tomorrow","url":"https:\/\/seecon.siera.com\/en\/"},{"@type":"WebSite","@id":"https:\/\/seecon.siera.com\/en\/#website","url":"https:\/\/seecon.siera.com\/en\/","name":"seecon Ingenieure GmbH","description":"Engineering for a Better Tomorrow","inLanguage":"en-GB","publisher":{"@id":"https:\/\/seecon.siera.com\/en\/#organization"}}]},"og:locale":"en_GB","og:site_name":"seecon Ingenieure GmbH - Engineering for a Better Tomorrow","og:type":"article","og:title":"Entwicklung Wachstuchfabrik Borsdorf \u2013 Projektsteuerung - seecon Ingenieure GmbH","og:description":"Kategorie Bebauungsplan, Projektsteuerung Kunde: Gemeinde Borsdorf SRM Holding GmbH Zeitraum 2020 \u2013 2024 Leistungsbestandteile Bebauungsplan, Verkehrsanlagen, Artenschutz, Gr\u00fcnordnungsplan, Medientechnische Erschlie\u00dfung, Energiekonzept, Projektsteuerung","og:url":"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/","article:published_time":"2023-07-06T04:08:53+00:00","article:modified_time":"2025-10-06T13:56:49+00:00","twitter:card":"summary_large_image","twitter:title":"Entwicklung Wachstuchfabrik Borsdorf \u2013 Projektsteuerung - seecon Ingenieure GmbH","twitter:description":"Kategorie Bebauungsplan, Projektsteuerung Kunde: Gemeinde Borsdorf SRM Holding GmbH Zeitraum 2020 \u2013 2024 Leistungsbestandteile Bebauungsplan, Verkehrsanlagen, Artenschutz, Gr\u00fcnordnungsplan, Medientechnische Erschlie\u00dfung, Energiekonzept, Projektsteuerung"},"aioseo_meta_data":{"post_id":"19353","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"ItemPage","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2024-12-19 11:13:18","updated":"2025-10-06 14:12:49","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/seecon.siera.com\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/seecon.siera.com\/en\/alle-projekte\/\" title=\"ALLE PROJEKTE\">ALLE PROJEKTE<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/seecon.siera.com\/en\/product-category\/stadt\/\" title=\"Stadt\">Stadt<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tEntwicklung Wachstuchfabrik Borsdorf \u2013 Projektsteuerung\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/seecon.siera.com\/en\/"},{"label":"ALLE PROJEKTE","link":"https:\/\/seecon.siera.com\/en\/alle-projekte\/"},{"label":"Stadt","link":"https:\/\/seecon.siera.com\/en\/product-category\/stadt\/"},{"label":"Entwicklung Wachstuchfabrik Borsdorf \u2013 Projektsteuerung","link":"https:\/\/seecon.siera.com\/en\/product\/entwicklung-kunstlederfabrik-borsdorf-projektsteuerung\/"}],"_links":{"self":[{"href":"https:\/\/seecon.siera.com\/en\/wp-json\/wp\/v2\/product\/19353","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/seecon.siera.com\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/seecon.siera.com\/en\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/seecon.siera.com\/en\/wp-json\/wp\/v2\/media\/22485"}],"wp:attachment":[{"href":"https:\/\/seecon.siera.com\/en\/wp-json\/wp\/v2\/media?parent=19353"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/seecon.siera.com\/en\/wp-json\/wp\/v2\/product_brand?post=19353"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/seecon.siera.com\/en\/wp-json\/wp\/v2\/product_cat?post=19353"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/seecon.siera.com\/en\/wp-json\/wp\/v2\/product_tag?post=19353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}